Tuesday, October 16, 2007

view from the road

Posted by Picasa
here is the masonry chimney for the woodstove in the living room. The work will also include a four foot high stone wall surround and a stone tiled hearth as well. The stone is really incredible and comes from a local quarry, it's called Searsmont Stone (after the location). This is a neat batch of sandstone he pulled out, as it is gray blue and striated delicately - and beautifully! This has been exciting work to track the progress on, and we can't wait to see the stone top out (the parts of the chimney that aren't visible (eg upstairs and in the attic) are just cinder block, not too exciting, but also invisible! The top out (the chimney you'll see out of the roof) will also be done in the searsmont stone! We think it's going to look really neat!
Posted by Picasa

roof-allujah!

Here is some of the latest work: The big roof was accomplished in three days by the roofing crew, the small roof we did in two days and still have one more day of work on trim on it! I guess they move a lot faster than us! :-) They did a great job, and this weekend are finishing the trim work (fascia boards) going to put up the typar covering for us over the attic part of the house.
Other work we've gotten done recently is to frame up most of the walls for the second floor (in preparation for the electrician, who we ARE going to have do the wiring for the house after all!) work on the shed roof, frame up interior walls for the basement to prepare for the insulation and the electrician (not in that order) and laying the attic decking. The odd structures you see on the roof are even odder looking now as more have been set up. That is the framing of the staging for the masons to put the chimney up through the roof. The masonry work so far is incredibly beautiful and we are really really pleased with our decision! We asked them to put in a stone mantelpiece and it came out tremendously. More work this week will include basement stairs, and getting ready for windows and doors (two of them need a bit of extra wood along the rough opening to accomodate a slightly smaller door and window than we originally cut for). What else? We are about to start the plumbing rough ins, and will probably start that this week. We have only another wall to build for the second floor (had to leave some space available for the masons to do their work upstairs). Then all the interior walls are done! Electricity has been hooked up - as far as the panel box goes and a single 110 outlet for us to work with. CMP amazed us by arriving a full two weeks worth of business days early and actually ENERGIZED the house yesterday! Amazing! Now the electrician really can do his work, AND we can start heating up soup and hot food for lunch on our trusty little hot plate! Yahoo!

It seems like forever since we've updated, and I'll search around and see if I can't find any other exciting photos to post! Bye!
Posted by Picasa

Monday, October 15, 2007

THE AUTUMN LEAVES ARE ARRIVING IN MID COAST MAINE! It's pretty breathtaking sometimes, to see the fabulous colors light up! So far we haven't driven off the road with our eyes a goggle. Or is it a google...
Posted by Picasa

Monday, October 1, 2007

I'll try that again
Posted by Picasa
here's the view from the front of the house. It's a little less intimidating looking to us size wise. We are still getting used to how tall the house looks. It's been a bit of a shock for two people planning to build a fairly small house. But we are really pleased with how it looks! Hard to believe we've built almost the entire thing. We are crazy.
Posted by Picasa